What we build, in detail

Four types of work, with the notices served and the certificates obtained.

Program 01 · Permission before ordering

New builds

We build to the approved drawings and we do not start before planning permission is granted, because a site stopped by the council costs far more than the fortnight it saved. Where the Construction (Design and Management) Regulations apply we take on the principal contractor duties properly, including the construction phase plan and notification where the project is notifiable.

  • Per project
  • Homeowners and developers
  • Written quote
  • Permission granted

Start this program

Step 1 · Survey

Site, access and ground conditions.

Step 2 · Notices

Party wall and Building Regs.

Step 3 · Build

Sequenced, with progress reported.

Step 4 · Certificate

Completion certificate obtained.

Step 1 · Check

Whether notice is required at all.

Step 2 · Serve

Notice to the adjoining owner.

Step 3 · Wait or appoint

Consent, or a surveyor appointed.

Step 4 · Build

Only once the procedure is complete.

Program 02 · Where party wall bites

Extensions and loft conversions

This is the work where the Party Wall Act matters most, and where it is most often ignored. Cutting into a shared wall, raising it, or excavating near next door's foundations all require notice to be served first. Done properly it is a form and a waiting period. Done late, it is a neighbour with the right to stop your build.

  • Per project
  • Homeowners
  • Written quote
  • Notices served

Start this program

Program 03 · Survey before stripping

Refurbishment

In anything built before 2000 we get an asbestos survey before intrusive work starts, because artex, insulation board and old floor tiles all commonly contain it and disturbing them contaminates a home. Notifiable electrical work goes through a Part P registered person and all gas work to a Gas Safe engineer; we coordinate rather than improvise.

  • Per project
  • Homeowners and landlords
  • Written quote
  • Asbestos survey

Start this program

Step 1 · Survey

Asbestos checked pre-2000.

Step 2 · Quote

Items and exclusions written.

Step 3 · Strip and build

Specialists where reserved.

Step 4 · Certificates

Electrical and Building Regs.

Step 1 · Scope

Surveyed, with the constraints.

Step 2 · Consents

What is needed, and from whom.

Step 3 · Programme

Sequence and dependencies written.

Step 4 · Hand over

Snagged, with certificates.

Program 04 · Programme in writing

Commercial fit-out

Commercial work usually fails on sequence rather than on workmanship: trades arriving in the wrong order, or a landlord's consent that nobody chased. We write the programme down including the dependencies, and we tell you which approvals sit outside our control — licence to alter, landlord consent, Building Regulations sign-off — rather than discovering them mid-job.

  • Per project
  • Businesses and landlords
  • Written quote
  • Consents obtained

Start this program

Got a project to price?

A free site visit and a written quotation, with the exclusions set out.